| Country |
Project
Title |
Year |
Tasks |
Client |
|
Tanzania |
Capacity Building of Urban and District Water Supply and Sewerage Authorities in Tanzania |
2009 - 2012 |
Enhance human resources capacities in selected regional and district urban water supply utilities by designing and implementing an appropriate capacity building programme, monitoring and evaluating its effectiveness and contributing to the institutionalization of capacity building in the relevant Tanzanian institutions |
RODECO
Consulting/Niras |
|
Romania |
Technical Assistance and Supervision for the ISPA Wastewater Contracts in Galati. |
2008 - 2009 |
Development of a Regional Master Plan (RMP) for water supply and wastewater in Galati County. Prepare option analysis, long-term investment programme, priority investment programme for the RMP. |
IGIP
/ Grontmij | Carl Bro A/S |
|
Ukraine |
Zhytomyr Water and Wastewater Project – Feasibility Study |
2008 |
The objective of this assignment is to perform a Feasibility Study, including due diligence of the company, to determine the investments to be financed by the EBRD loan:
|
EBRD |
|
Ukraine |
Monitoring and advisory services for the UNDP Crimea Integration and Development Program “Project on Decentralized Public Service Delivery in the Rural Water Supply Sector |
2007
|
|
UNDP |
|
Romania |
Strengthening
the programming capacity for the Ministry of Environment and Water (MEWM)
Management in Romania |
2007
|
|
EPTISA
/ |
|
Ukraine
|
“International Expert on Water and Environment for the Elaboration of a Sector Strategy to be Incorporated Into the Crimean Regional Development Strategy |
2007
|
|
UNDP |
|
Ukraine
|
“Assessment of the Status of Decentralisation and Services Provision in the Water Supply Sector- in Selected Locations in Ukraine” |
2007
|
|
SKAT |
|
Bulgaria
|
Financial and Operational Improvement Plan and Corporate Development Plan – Burgas Water Project |
2006
|
|
iC Consulenten; Financing: EBRD |
|
Turkey |
Consultancy Services for Final Measures Project Implementation - Diyarbakir Sewerage Project - Sewer Operation Services |
2006
|
Institutional strengthening and restructuring for the sewerage company in the town of Diyarbakir/East Turkey (900.000 inhabitants).
|
CES
Consulting Engineers Salzgitter; Financing: KfW |
|
Serbia |
Urban Water Supply and Sewerage Systems in Novi Sad, Nis, Kragujevac and Belgrade – Phase III |
2005 |
Preparation of a technical proposal for Rehabilitation of urban Water Supply and Sewerage Systems in Novi Sad, Nis, Kragujevac and Belgrade – Phase III. |
Dorsch Consult |
|
Albania |
Pogradec Water Supply System |
2005 |
Preparation of detailed designs for Pogradec Water Supply System (€ 9 million investments). |
iC Consulenten; |
|
Bulgaria |
Preparation
of investment projects for upgrading of water and sewerage systems in
Rousse and Sliven |
2005 |
|
iC
Consulenten/ |
|
Syria |
Tariff Study for Syrian Water Sector |
2006 |
Develop Short and Mid-Term Tariff Options for all water & wastewater establishments in Syria (financed by EIB). |
Seureca/ |
|
Czech
Republic |
Study on Efficiency Improvement for the Regional Water Utility “VAK Hodonin” |
2005 |
|
Aqua Plus (Austrian Water Operator) |
|
Kyrgyz Republic |
Small towns infrastructure & capacity building project |
2004 |
Identification of priority projects for water and solid waste infrastructure in 7 small towns
|
Posch&Partner
/The World Bank |
|
Albania |
Shkodra-Four Villages |
2004
|
Institutional strengthening for two water utilities in the Region of Shkodra
|
iC Consulenten/ |
|
| Reference
1987-2003*
|
|||||
|
|
XELAGUA |
1997-2001 |
Institutional restructuring
of a water utility in Quezaltenango/Guatemala |
ADC |
|
|
Egypt |
Water Market Study |
2000 |
strategy for the Austrian Water Industry to develop
the Egyptian water market |
ÖKB |
|
|
Haiti |
Tariff Study |
1999 |
Study on the water tariffs; Development of a standardised
tariff calculation model. |
IDB |
|
|
Rwanda |
Kigali 2000 |
1997-2001 |
Construction Supervision of a water treatment plant
for the extension of the potable water supply of Kigali. |
ADC |
|
|
Honduras |
PSP in WAT&SAN for San Pedro Sula |
1998 |
Elaboration of a strategy
for privatisation of the water supply and waste water treatment company
of San Pedro Sula/Honduras (750.000 inhab.) |
IDB |
|
|
Uganda |
Kisoro town water & sanitation project |
1996-2000 |
Water and Sanitation System for Kisoro town/UGANDA |
ADC |
|
|
Cap Verde |
Water Management Plans |
1997-2001 |
Watershed management in two
selected hydrological catchment areas in Santiago/Cap Verde. |
ADC |
|
|
Cap Verde |
Ribeireta - IWRM |
1997-2001 |
Integrated watershed management
in Ribeireta/Santiago/Cap Verde. |
ADC |
|
|
Cap Verde |
Operational Plans |
2000-2001 |
Development of tools for
project management, budget planning and monitoring |
ADC |
|
|
Haiti |
PSP - Haiti |
1996-1997 |
Study on the
private sector participation for water supply companies in Haiti |
IDB |
|
|
Kenya |
KWAHO Performance Profile |
1996 |
Elaboration
of a performance profile for a Kenyan NGO (KWAHO – Kenya Water for Health
Organisation). |
ADC |
|
|
Burundi |
Plan Directeur National de l’eau |
1993-1998 |
National Master
Plan for Water Resources Development |
ADC |
|
|
Burundi |
WIP II |
1992-1993 |
Design and
preparation of tender documents for nine rural drinking water systems
in Burundi |
ADC |
|
|
Burundi |
Road Construction to Buhuri |
1992 |
Planning and
Design of a rural access road in RUMONGE/BURUNDI |
Austrovieh |
|
|
Zambia |
Groundwater recharge in Zambia |
1989 |
Study on drinking
water supply, ground-water recharge and retention of discharge waters. |
IIZ |
|
|
|||||